One Team, one vision

CALM BUOY MOORING FABRICATION

CALM BUOY MOORING FABRICATION

Our willingness is to be the partner of choice for the main engineering companies in the field.

Catenary Anchor Leg Mooring ( CALM buoy ) system commonly helps tankers loading or discharging various forms of crude oil from floating storage in deep water.

This Single Buoy Mooring is anchored to the seabed by catenary chain legs which are secured to anchors or piles.

Our experienced and highly qualified team is capable to complete CALM buoy systems onshore fabrication projects on time, and cost-effective, including, procurement and construction.

30 years of experience in the oil and gas industry, has formed our professionals and grown our steel fabrication capabilities, delivering each project safely completed with high-quality standards.

Our two shipyards are located in a strategic position in MidAtlantic – West Africa, where three continents are connected, offering a cost-effective solution to support the main engineering companies by fabricating Single Point Mooring Systems.

Turret-cans-upper

SINGLE POINT MOORING BUOY FABRICATION

Powerful Mechanical and Electrical Division

MECHANICAL

 

We can provide resources for mechanical design requirements and marine mechanical experts.

HYDRAULIC

Decades of expertise in the oil and gas sector providing hydraulics services for newbuild, repair, or maintenance jobs, allows us to ensure the proper functionality of each piece of equipment.

Electrical

Hidramar Group can easily provide services from the marine electrical design phase to any marine electrical support required.

Construction

Our Construction team ensures the manufacturing of goods, products ordered by the clients by following applicable procedures and state-of-the-art fabrication methodologies defined upfront with the Engineering department to ensure lean manufacturing processes all the way through.

Our capabilities in terms of structural, pressure piping, blasting & painting, instrumentation, electrical works allow us to fabricate a very large range of products always with a very high level of productivity, quality, and safety.
By continuously monitoring our performance indicators related to the fabrication activities, improving our facilities and, investing in modern machines, we continuously increase our capabilities and capacities in delivering large scale fabrication services with lean manufacturing processes.

Power-buoy-fabrication-tenerife-shipyards
Engineering for buoy offshore fabrication

OFFSHORE STRUCTURE FABRICATION.

OFFSHORE STRUCTURE FABRICATION.

We provide cost-effective Engineering, Procurement, Offshore Structure Fabrication, and, Maintenance services.

 

    Hidramar, S.L., as the data controller, will process your personal data for the purpose of fully addressing your information request. The lawful basis for processing is your consent. Likewise, your personal data will not be transferred to third parties, except to companies that are part of the Hidramar Investments, S.L. group, and/or to organizations or entities as legally required. International transfers of your personal data are not anticipated.
    Finally, please be informed that you may exercise your rights of access, rectification, objection, erasure (“right to be forgotten”), restriction of processing, data portability, and the right not to be subject to individualized decisions, as explained in the additional information. You may consult this information through our Privacy Policy.


    Can you confirm you're not a robot?



    [dica_divi_carousel item_width_auto=”on” item_width=”290px” multislide=”on” loop=”on” autoplay=”on” autoplay_speed=”2000″ arrow_nav=”on” item_vertical_align=”center” advanced_effect=”coverflow” overlay_image=”on” overlay_color=”rgba(12,80,144,0.41)” overlay_icon_color=”#5bc5f2″ arrow_nav_color=”#0c5090″ align=”center” _builder_version=”4.16″ border_radii_image=”on|5px|5px|5px|5px” global_colors_info=”{}”][dica_divi_carouselitem button_url_new_window=”1″ image=”https://hidramargroup.com/wp-content/uploads/2022/05/Power-buoy-mooring-system.jpg” image_lightbox=”on” _builder_version=”4.16″ global_colors_info=”{}”][/dica_divi_carouselitem][dica_divi_carouselitem button_url_new_window=”1″ image=”https://hidramargroup.com/wp-content/uploads/2020/12/Rolling-Machine-CALM-Buoy-Fabrication.jpg” image_lightbox=”on” _builder_version=”4.16″ global_colors_info=”{}”][/dica_divi_carouselitem][dica_divi_carouselitem button_url_new_window=”1″ image=”https://hidramargroup.com/wp-content/uploads/2022/05/power-buoy-fabrication-stillstrom-project.jpg” image_lightbox=”on” _builder_version=”4.16″ global_colors_info=”{}”][/dica_divi_carouselitem][dica_divi_carouselitem button_url_new_window=”1″ image=”https://hidramargroup.com/wp-content/uploads/2020/05/steel-cutting.jpg” image_lightbox=”on” _builder_version=”4.16″ global_colors_info=”{}”][/dica_divi_carouselitem][dica_divi_carouselitem button_url_new_window=”1″ image=”https://hidramargroup.com/wp-content/uploads/2022/05/can-fabrication-for-calm-buoy.jpg” image_lightbox=”on” _builder_version=”4.16″ global_colors_info=”{}”][/dica_divi_carouselitem][dica_divi_carouselitem button_url_new_window=”1″ image=”https://hidramargroup.com/wp-content/uploads/2020/05/welding-_TIG_-MIG.jpg” image_lightbox=”on” _builder_version=”4.16″ global_colors_info=”{}”][/dica_divi_carouselitem][dica_divi_carouselitem button_url_new_window=”1″ image=”https://hidramargroup.com/wp-content/uploads/2020/05/construction-landing-platform.jpg” image_lightbox=”on” _builder_version=”4.16″ global_colors_info=”{}”][/dica_divi_carouselitem][dica_divi_carouselitem button_url_new_window=”1″ image=”https://hidramargroup.com/wp-content/uploads/2020/12/CaLM-Buoy-Fabrication-process-piping-fabrication-and-isntallation.jpg” image_lightbox=”on” _builder_version=”4.16″ global_colors_info=”{}”][/dica_divi_carouselitem][/dica_divi_carousel]