One Team, one vision

OFFSHORE WIND

FABRICATION

OFFSHORE WIND FABRICATION

We deeply believe that there is an opportunity to change how the world produces and provides services.

Hidramar Group’s experience and the welding & steel cutting high technology in our facilities has provided the Group with the capabilities to deliver cost-effective solutions for offshore wind fabrication projects that require the-state-of-the-art in all fabrication process.

Hidramar Group’s strategic location and in-house engineering integrated with our fabrication shops allow us to deliver accuracy and time efficiency to our client’s demands.

GREEN ENERGY FABRICATION

Offshore fabrication

Management project

 

The Group is actively involved in pioneering offshore wind fabrication projects like power buoy fabrication that support the decarbonisation of the maritime industry by eliminating idle emissions.

On every project, a management team is assigned to put in place all Key Performance
Indicators to define and control the project schedule, budget, quality, safety and risks.

fabrication engineering

Our team is focused on supporting the offshore wind fabrication activities by preparing all fabrication drawings: shop drawings, nesting sheets, cutting sheets, fabrication aids design, associated calculation notes if needed, layouts, lifting & handling plans, procedures and welding engineering.

On top of the fabrication support, we can provide Engineering Design service
on demand.

construction

By continuously monitoring our performance indicators related to the fabrication activities, improving our facilities and, investing in modern machines, we continuously increase our capabilities and capacities in delivering large scale fabrication services with lean manufacturing processes.

procurement and logistic

Developed from the naval sector, our Procurement team has created a broad local and international network to supply and expedite raw materials ensuring the required traceability while supporting 24/7 our Construction team.

WE CAN DELIVER

  • Floaters
  • Anchor
  • Topside Modules
  • Stingers Installation Aids
  • Trawling protections
  • Pig Launcher & Receiver
  • Piles/ Offshore wind foundations
  • Skids
  • Mid Water Arch
  • WYE / TEE modules
  • Flare Tower / Vent Mast
  • Substations
  • Living quarters
  • Calm Buoys
  • Mooring
  • Systems Crane
  • Pilars
  • SSIVs
  • Topsides’ piping
  • Monopiles
  • SDUs / UTAs
  • Goosenecks
  • Subsea rigid jumpers / spools
  • Risers Guard
  • PLETs/ PLEMs/ ILTs
  • Template Structures
  • Jackets
Pivotbuoy-assembled-vestas
PivotBuoy Load out at Hidramar Shipyards
Rolling-machine-for-offfshore-wind-fabrication
Mob and Demob pivotbuoy deployment

OFFSHORE STRUCTURE FABRICATION.

OFFSHORE WIND FABRICATION.

We provide cost-effective Engineering, Procurement, Offshore Wind Fabrication and Maintenance services.

 

[dica_divi_carousel item_width_auto=”on” item_width=”290px” multislide=”on” loop=”on” autoplay=”on” autoplay_speed=”2000″ arrow_nav=”on” equal_height=”on” advanced_effect=”coverflow” overlay_image=”on” overlay_color=”rgba(12,80,144,0.41)” overlay_icon_color=”#5bc5f2″ arrow_nav_color=”#0c5090″ align=”center” _builder_version=”4.16″ border_radii_image=”on|5px|5px|5px|5px” global_colors_info=”{}”][dica_divi_carouselitem button_url_new_window=”1″ image=”https://hidramargroup.com/wp-content/uploads/2020/05/Rolling-Machine-contrction.jpg” image_lightbox=”on” _builder_version=”4.16″ global_colors_info=”{}”][/dica_divi_carouselitem][dica_divi_carouselitem button_url_new_window=”1″ image=”https://hidramargroup.com/wp-content/uploads/2020/12/Rolling-Machine-CALM-Buoy-Fabrication.jpg” image_lightbox=”on” _builder_version=”4.16″ global_colors_info=”{}”][/dica_divi_carouselitem][dica_divi_carouselitem button_url_new_window=”1″ image=”https://hidramargroup.com/wp-content/uploads/2020/05/DSC_000475-CLEAN-scaled.jpg” image_lightbox=”on” _builder_version=”4.16″ global_colors_info=”{}”][/dica_divi_carouselitem][dica_divi_carouselitem button_url_new_window=”1″ image=”https://hidramargroup.com/wp-content/uploads/2020/05/steel-cutting.jpg” image_lightbox=”on” _builder_version=”4.16″ global_colors_info=”{}”][/dica_divi_carouselitem][dica_divi_carouselitem button_url_new_window=”1″ image=”https://hidramargroup.com/wp-content/uploads/2020/05/metal-cutting_-oxycut_-plasma-cutting.jpg” image_lightbox=”on” _builder_version=”4.16″ global_colors_info=”{}”][/dica_divi_carouselitem][dica_divi_carouselitem button_url_new_window=”1″ image=”https://hidramargroup.com/wp-content/uploads/2020/05/welding-_TIG_-MIG.jpg” image_lightbox=”on” _builder_version=”4.16″ global_colors_info=”{}”][/dica_divi_carouselitem][dica_divi_carouselitem button_url_new_window=”1″ image=”https://hidramargroup.com/wp-content/uploads/2020/05/construction-landing-platform.jpg” image_lightbox=”on” _builder_version=”4.16″ global_colors_info=”{}”][/dica_divi_carouselitem][dica_divi_carouselitem button_url_new_window=”1″ image=”https://hidramargroup.com/wp-content/uploads/2020/12/CaLM-Buoy-Fabrication-process-piping-fabrication-and-isntallation.jpg” image_lightbox=”on” _builder_version=”4.16″ global_colors_info=”{}”][/dica_divi_carouselitem][/dica_divi_carousel]