One Team, one vision

OIL & GAS SUPPORT

HIDRAMAR GROUP

 

West Taurus

RIG SUPPORT & MAINTENANCE

Tenerife Shipyards performed the fabrication and installation of a new cofferdam for the rig “West Taurus”, property of Seadrill. 

Pioneering Spirit

RIG SUPPORT & MAINTENANCE

Tenerife Shipyards performed the fabrication and installation of a new cofferdam for the rig “West Taurus”, property of Seadrill. 

West Carina & West Jupiter

RIG SUPPORT & MAINTENANCE

Tenerife Shipyards performed the fabrication and installation of a new cofferdam for the rig “West Taurus”, property of Seadrill. 

Valaris DS-7

RIG SUPPORT & MAINTENANCE

Tenerife Shipyards performed the fabrication and installation of a new cofferdam for the rig “West Taurus”, property of Seadrill. 

Rig Upgrades  services we provide:

Drilling rig preservation from operations to cold stacks or smart stack.

Rig reactivation from cold stack or smart stack to operations.

2nd BOP & MPD readiness package delivery from engineering, procurement, installation, commisioning based on fixed price contracts.

Drill pipes inspection CAT 4 or 5 and repairs to API standards and NOV GP threads GPDS, HT, TT, UGPDS, XT, & VAM Express (CDS and EIS).

Supply and fabrication of HP piping ( cement lines , mud lines , choke and kill lines (AISI 4130 Steel – API 5L X52 pipe)

Diving support, for Hull cleanning,UWILD, and underwater inspections.

Annual Recertification services

OEM support

BOP dismantle and assembly as well as installation onboard.

Drilling and mud pump & auxilaries overhaul.

Coflexip hose inspection and pressure test up to 22500 PSI.

Marine risers and telescopic joints inspection and repairs.

Accommodations Upgrades.

Thruster removal and installation as well as preservation/ Depreservation.