Mobilization and Demobilization Projects in The Middle of Atlantic Hidramar Group your one-stop solution for mobilization and demobilization projects. While Hidramar Group keeps developing, our strategic location becomes more convenient to our Clients....
When Dry Dock Is Not the Only Option for A Tail Shaft Seal Replacement Hidramar Group recently assisted in a stern tube seal replacement on a tanker vessel while afloat. The vessel had an overall length and breadth extreme of 228.6*32.26m. The project was...
Hidramar Group Takes on Hull Repair of a Crude Oil Tanker Vessel Hidramar Group recently repaired the hull of a crude oil tanker vessel. The vessel had an overall length and breadth extreme of 249.98*44.03m. It was delivered on time in our berthing line, and...
Recent Comments